Fixed feePackages with a defined scope and a fixed fee
For the work that comes up most. Scope, deliverable, and fee are set before we start. Every service begins with a free 30-minute consultation.
Start hereFree 30-minute consultation
Free
What's included
- A call with an engineer about the condition, the site, or the scope
- Narrowing the scope and settling the approach
- Confirming the fee and the schedule
What you receive
A written scope and fee, or a plain answer that you do not need us.
Anticipated turnaround*
Within 1 business day
Fixed feeGPR survey of a concrete slab or wall for steel reinforcement
Fee on request
What's included
- Ground-penetrating radar scan of the slab or wall areas you mark
- Reinforcement, conduit, and void locations marked on the surface
- Photos of the marked areas
What you receive
A marked-up concrete section showing what was found and where, so you can core, cut, or anchor with confidence. GPR is an interpretation of the signal: we mark what it shows and flag what it cannot see.
Anticipated turnaround*
Same day
Fixed feeVibration monitoring, by the week
Fee on request
What's included
- Monitoring plan with thresholds tied to the governing specification
- Up to three seismographs installed, with one field day at setup observing the equipment and the sources of vibration, and a daily field report
- Units record unattended for the rest of the week and are picked up at the end of it; power at the monitor locations by others (solar units at extra cost)
What you receive
A weekly event report and a close-out report the adjacent owner and the agency will accept.
Anticipated turnaround*
Weekly report within 1 to 2 business days of pickup
Fixed feeVibration data engineering interpretation
Fee on request
What's included
- Review of the monitoring record against the thresholds
- Engineering interpretation of exceedances and trends
- A written opinion on whether work can continue and what should change
What you receive
A sealed interpretation letter for the project file.
Anticipated turnaround*
1 to 2 business days
Fixed feePE consultation, by the hour
Fee on request
What's included
- A Professional Engineer on the phone, on a call, or at the table
- Review of drawings, photos, or a condition you describe
- Plain-language answers and the options available
What you receive
Answers you can act on, and a scope if the work goes further.
Anticipated turnaround*
Scheduled within 1 to 2 business days
Fixed feePE field inspection and observation, by the day
Fee on request
What's included
- A licensed Professional Engineer on site
- Observation, documentation, and a same-day field report with photos
- Public-sector documentation discipline
What you receive
A field report and a presence the agency or CM can rely on.
Anticipated turnaround*
Report the same day
Fixed feeBasic geotechnical report
Fee on request
What's included
- Subsurface investigation program scoped to the project
- Coordination of drilling, test pits, and laboratory testing (performed by others and billed separately)
- Analysis of bearing, settlement, and groundwater conditions
What you receive
A sealed geotechnical report with foundation and earthwork recommendations ready for design and permitting.
Anticipated turnaround*
2 to 5 business days after laboratory testing is complete
Fixed feeField engineer for borings or deep-foundation installation, by the day
Fee on request
What's included
- An engineer on site to observe borings or document pile and deep-foundation installation
- Logs, counts, and photos kept as the work happens
- Same-day field report
What you receive
A field record the geotechnical and structural engineers can rely on.
Anticipated turnaround*
Report the same day
Fixed feeInfiltration study
Fee on request
What's included
- Observation and logging of test pits or borings at the proposed stormwater locations (excavator or drill rig by others, or arranged at extra cost)
- Field infiltration testing to the reviewing agency's method
- Soil logs and groundwater observations
What you receive
An infiltration report formatted for the stormwater review.
Anticipated turnaround*
1 to 2 business days
Fixed feeEngineering letter of opinion
Fee on request
What's included
- Site visit and visual assessment
- Review of available drawings and reports
- Engineering analysis of the condition in question
What you receive
A sealed letter of opinion stating the condition, its probable cause, and recommended next steps.
Anticipated turnaround*
1 to 2 business days
Fixed feeForensic engineering review, by the hour
Fee on request
What's included
- Review of another party's report, inspection records, or test data
- Condition review from your photos, drawings, and documents
- Participation in meetings, calls, and site walks as the engineer in the room
What you receive
Written comments or a verbal briefing, and a scope if the matter needs a letter of opinion or an investigation.
Anticipated turnaround*
Scheduled within 1 to 2 business days
By arrangementExpert witness and litigation support
Rate on request
What's included
- Review of the record and an independent engineering opinion
- Expert reports, affidavits, and declarations
- Deposition and trial testimony
What you receive
An independent opinion the attorney can put in front of the other side, and an engineer who can defend it.
Anticipated turnaround*
Scheduled with counsel
Fixed feeSpecial inspection by a certified inspector who is also a licensed PE, by the day
Fee on request
What's included
- An ACI, ICC, and OSHA certified inspector who is also a licensed Professional Engineer
- Soils, concrete, steel and reinforcement, fireproofing, firestopping, intumescent coating, adhesion testing, coating thickness, and many others
- Same-day inspection report with photos, filed the way the jurisdiction expects
What you receive
Inspection reports the jurisdiction accepts, with a PE's judgement on site when a condition does not conform.
Anticipated turnaround*
Report the same day
Fixed feeField coring package
Fee on request
What's included
- A two-person crew with a coring rig
- Cores in asphalt, concrete, or shotcrete
- Compressive strength testing of concrete cores to ASTM C42
What you receive
A field coring report, then a compressive strength report from the laboratory.
Anticipated turnaround*
Field report the same day or within 1 business day; compressive strength report within 7 business days, per the core conditioning and testing requirements of ASTM C42
Fixed feePull and adhesion testing
Fee on request
What's included
- Substrates, topping slabs, and waterproofing
- Mechanical and adhesive anchors, railings, and fall-protection tie-off anchors
- DeFelsko and Elcometer adhesion testers, Allfasteners and other load cells, as the ASTM or test method requires
What you receive
A test report with the loads reached, the method, and pass or fail against the specification.
Anticipated turnaround*
1 to 2 business days
Fixed feeCivil engineering consultation, by the hour
Fee on request
What's included
- A civil engineer on the phone, on a call, or at the table
- Review of a site plan, grading and drainage, or review comments on an application
- Plain-language answers and the options available
What you receive
Answers you can act on, and a scope if the work goes further.
Anticipated turnaround*
Scheduled within 1 to 2 business days
Fixed feeCivil field engineer, by the day
Fee on request
What's included
- An engineer on site for grading, drainage, stormwater, and site work observation
- Verification against the approved plans and coordination with the contractor
- Same-day field report with photos
What you receive
A field report the municipality and the owner can rely on.
Anticipated turnaround*
Report the same day
Fixed feeCompliance and violation-removal engineering, by the hour
Fee on request
What's included
- Review of the existing inspection and testing record: what can be used, what cannot, and why
- Review of open building-code and housing-code violations, including NYC DOB and OATH/ECB, and what will remove them
- The engineering submissions, correspondence, and filings the sign-off needs
What you receive
A written plan for the sign-off or the violation, then the engineering to close it.
Anticipated turnaround*
Scheduled within 1 to 2 business days